Shelby Job Number | 210 |
---|---|
Project Name | Kirkman Road Extension |
Project Location | Orange County, FL |
Prime Contractor Name | Johnson Bros. Corporation |
Superintendent for Project | Mike Wagner |
Years | 3 |
Days | 121 |
Project Details | Kirkman Rd is proposed to be widened and extended south to a new intersection with Universal Blvd. The proposed typical section includes 3-lanes in each direction with 2 dedicated transit lanes in the median. The North section project area requires the reconfiguration of the existing Kirkman Rd/SLR interchange with a new single point urban interchange, as well as the reconstruction of SLR from the Universal Blvd on west to the Greenbriar Parkway intersection on the east as a 6-lane divided roadway. The new interchange will continue to provide free flow access to and from LMC. Video: https://youtu.be/KqSaTQx7X7Y |
Type of Work | Rebar Installation |
Rebar Quantity | 3,853,841 lbs |
Prime Contract Value | $315,000,000.00 |
Shelby Erectors Subcontract Value | $1,192,694.00 |
Online link to project page | https://www.orangecountyfl.net/Portals/0/Library/Traffic-Transportation/docs/Kirkman%20Road%20Extension%20Fact%20Sheet_ADA.pdf |