Shelby Job Number | 174 |
---|---|
Submission Type | New Project |
Project Name | Bridge Replacement at 40th Avenue NE over Placido Bayou |
Project Location | Pinellas County, Florida |
Prime Contractor Name | Orion Marine Construction, Inc. |
Superintendent for Project | Manuel Ruiz |
Years | 1.04 |
Days | 380 |
Project Details | This project provides for the construction of a new 40th Avenue NE Bridge and subsequent demolition and removal of the existing bridge. The Bridge will be constructed in two major phases allowing for two lanes of traffic to be maintained. The new bridge will accommodate two lanes of traffic, bicycle lanes, raised sidewalks, and a raised median. This is a LAP project that will utilize federal funds for construction. |
Type of Work | Rebar Installation |
Rebar Quantity | Black Rebar 75,350 lbs. / Stainless Steel Rebar 2,466 lbs. |
Prime Contract Value | $10,719,477.00 |
Additional Information | This is a special project that uses Fiber Reinforced Polymer Bars (GFRP) in the substructure. This is fiberglass reinforcing bars in lieu of steel reinforcing bars (Rebar) Total Quantity is 141,293 LF |
Images | https://cdn.shelbyerectors.com/wp-content/uploads/2021/08/09120106/Job-174-Plan-Sheet.pdf |