Shelby Job Number | 250 |
---|---|
Project Name | 1-4 @ Sand Lake Rd Interchange |
Project Location | Orlando, FL |
Prime Contractor Name | Lane Construction |
Superintendent for Project | Vince Rankin |
Time frame for completion | |
Years | 3 |
Days | 0 |
Project Details | The existing I-4 (SR 400) / Sand Lake Road interchange shall be reconstructed to include ramp connections between the I-4 (SR 400) General Use Lanes and Sand Lake Road, between I-4 (SR 400) WB General Use Lanes and Turkey Lake Road, and Sand Lake Road WB with Turkey Lake Road. I-4 (SR 400) shall be reconstructed with the addition of two barrier separated Express Lanes from west of SR 482 to I-4 Ultimate as shown in the Concept Plans. Transitions shall tie the reconstructed I-4 (SR 400) to the existing I-4 (SR 400) to the west of SR 482. |
Project Scope | |
Type of Work | Rebar & SIP Installation |
Rebar Quantity | 2,153,850 LBS |
SIP Quantity | 88,613 GSF |
Prime Contract Value | $N/A |
Shelby Erectors Subcontract Value | $1,011,420 |
Online link to project page | https://i4beyond.com/project-designs/segment-designs/sand-lake-road-interchange-improvements/ |