| Shelby Job Number | 224 |
| Project Name | SR 687 Bridge Replacement |
| Project Location | Pinellas County, FL |
| Prime Contractor Name | Superior Construction |
| Superintendent for Project | Martin, Cory |
| Years | 1 |
| Days | 325 |
| Project Details | This project is replacing the 4th Street bridges between I-275 and 119th Ave. in Pinellas County. The new bridges will include two twelve-foot travel lanes, a six-foot inside shoulder, and a ten-foot outside shoulder. One of the bridges will also include a twelve-foot multi-use path separated by a barrier wall. |
| Type of Work | SIP Installation |
| SIP Quantity | 21,961 SQF |
| Prime Contract Value | $8,992,000.00 |
| Shelby Erectors Contract Value | $58,228.76 |
| Online Link to Project Page | https://www.fdottampabay.com/project/439/430500-1-52-01 |