Shelby Job Number | 219 |
---|---|
Project Name | Tampa Airport Red Side Terminal Expansion |
Project Location | Hillsborough County, FL |
Prime Contractor Name | The Middlesex Corporation |
Superintendent for Project | Manuel Ruiz |
Years | 2 |
Days | 0 |
Project Details | The project is designed to reduce congestion for both arriving and departing passengers while allowing those without checked baggage the ability to get picked up or dropped off, bypassing the ticketing or baggage claim levels. Completion of the Red Express Curbsides and new Airside D Shuttle station in the Main Terminal is expected to be completed by summer of 2025. |
Type of Work | Rebar and SIP Installation |
Rebar Quantity | 1,628,320 lbs. |
SIP Quantity | 28,739 GSF |
Prime Contract Value | $543,800.000.00 |
Shelby Erectors Subcontract Value | $632,542.32 |
Online link to project page | https://news.tampaairport.com/tpa-makes-way-for-a-major-red-side-construction-project/ |