I-75 Emergency Repair
Shelby Job Number | 249 |
---|---|
Project Name | I-75 at SR 951 |
Project Location | Naples, FL |
Prime Contractor Name | The de Moya Group |
Superintendent for Project | Jack Thomas |
Time frame for completion | |
Years | 2 |
Days | 172 |
Project Details | This project consists of the reconstruction of the I-75 at SR 951 Interchange from the existing Diamond Interchange to a Partial Cloverleaf Interchange with two connection ramps over SR 84/Davis Boulevard, from and to CR 951 (Collier Boulevard), to provide for the “Ultimate Configuration”. The existing I-75 bridges over SR 951 shall remain. New bridges to accommodate ramp traffic shall be constructed adjacent to the existing mainline bridges as well as new bridges on SR 951 over Davis Boulevard shall be constructed for direct interstate access. |
Project Scope | |
Type of Work | Rebar and SIP Installation |
Rebar Quantity | 1,302,424 lbs. |
SIP Quantity | 61,000 GSF |
Prime Contract Value | $98,370,748.55 |
Shelby Erectors Subcontract Value | $666,856.97 |
Additional Information | |