Shelby Job Number | 254 |
---|---|
Project Name | Micco Road Bridge Replacement |
Project Location | Sebastian, FL |
Prime Contractor Name | Vecillio & Grogan |
Superintendent for Project | Vince Rankin |
Time frame for completion | |
Years | 1 |
Days | 213 |
Project Details | The project is located along Micco Road, near Sebastian southwest of Barefoot Bay in Brevard County, Florida. The project involves the replacement of an existing structurally deficient bridge along Micco Road over the Sottile Canal. The replacement bridge will span over the Sottile Canal in a single span. The replacement bridge will carry two 11-foot travel lanes with 8-foot shoulders and a barrier protected 5-foot sidewalk. |
Project Scope | |
Type of Work | Rebar and SIP Installation |
Rebar Quantity | 62,446 lbs. |
SIP Quantity | 3,673 SF |
Prime Contract Value | $N/A |
Shelby Erectors Subcontract Value | $41,229.82 |
Additional Information | |
Online link to project page | https://spacecoastdaily.com/2024/01/micco-road-bridge-over-sottile-canal-closed-for-replacement-current-bridge-constructed-in-1938/ |