Project Name | US 27 at SR 60 Interchange |
---|---|
Project Location | Lake Wales, Florida |
Type of Project | Rebar |
Prime Contractor Name | Prince Contracting, LLC |
Project Length | 3.56 |
Project Details | The improvements under this contract consist of the complete interchange reconstruction at US 27 and SR 60 for 0.909 miles in Polk County. Major work items consist of milling and resurfacing, roadway and shoulder reconstruction (both flexible and rigid pavement), roadway and shoulder widening, sidewalks, driveways, drainage improvements, curb and gutter, signals, signing and pavement markings, lighting and noise walls. SR 60 will be reconstructed over US 27 with a single span bridge. |
Project Scope | Rebar Installation Prime Contract Value – $44,711,727.00 |
Additional Information | Project Map – https://data.fdot.gov/road/projects/#/ContractId=’T1754‘ Project information – http://swflroads.com/us27/sr60/ |